EATON AR App: Envision Your Switchboard Lineup and Requirements in Eaton’s New AR App

DCS-24-Eaton-EATONARApp-400.jpg

April 15, 2021

Add or remove switchboard structures according to your construction needs, such as the main incoming with or without Canadian metering requirements, distribution loads, and submain sections. Verify your assembly footprint with thermal magnetic devices such as breakers and fusible switches (with or without meter sockets). Check for clearances and cable landing locations.

No need to guess what configuration will best suit your needs or wonder how the Pow-R-Line CS switchboard will fit in your location. Eaton’s interactive 3D online experience puts the power of choice in your hands.

Want more control? Eaton’s new EatonAR app gives you an augmented reality, 360-degree view of the Pow-R-Line CS switchboard in your chosen location. Configure and experience your lineup today.

Available at Apple App Store or Google Play.

{videobox}cTkzeUiE_KA{/videobox}

For more information, visit www.eaton.com.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • The Time is Now: An Industrial Energy Efficiency Action Plan

    June 13, 2025 In a whitepaper released on June third, ABB has set out the scale of the challenge facing the global industrial sector and emphasizes the critical role of industrial energy efficiency in meeting rising energy demand while strengthening energy security & affordability and driving industrial competitiveness. With 45% of the world’s electricity converted… Read More…

  • Designing for Demand: The Role of Transformers in a Resilient EV Future

    June 11, 2025 Transformers in the EV Charging Boom: Are We Ready for the Load? As electric vehicles (EVs) continue their rapid rise, one question looms over the energy sector, municipalities, and developers alike: Is our infrastructure truly ready for the surge in demand? From city streets to highway rest stops, new EV chargers are… Read More…