Pressure Switch Comparison from Gems Sensors & Controls

DCS Pressure Switch Comparison from Gems Sensors and Controls 1 400x275

November 14, 2-22

 

Gems Sensors offers many different pressure switches for different applications. Whether you need a low pressure switch for sensing air in a manifold or a high pressure switch for sensing hydraulic oil in a off-highway vehicle, Gems has a pressure switch to fit your needs. 
 
Please see the chart below to see a side-by-side difference between the Pressure Switch offerings.

 

DCS Pressure Switch Comparison from Gems Sensors and Controls 2 900x763

 

To learn more about Gems Sensors & Controls’ Pressure Switch offerings, click here 

Gems Sensors Logo 300x150

 

 

 

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • The Power of OMRON’s Sysmac Studio: Unify Automation and Integrate Safety

    November 7, 2025 By Omron Automation Industry moves fast. Outpace obsolescence with OMRON’s Sysmac Studio. Designed to empower operations from the edge to the cloud, it unifies automation by prioritizing safety and security. Built for today, ready for the future. Today, the factory floor faces pressure from suppliers, consumers, competition, and emerging technologies. Operation teams… Read More…

  • NVIDIA 800 VDC Architecture Will Power the Next Generation of AI Factories

    November 4, 2025 By Mathias Blake, Martin Hsu, Ivan Goldwasser, Harry Petty and Jared Huntington The exponential growth of AI workloads is increasing data centre power demands. Traditional 54 V in-rack power distribution, designed for kilowatt (KW)-scale racks, isn’t designed to support the megawatt (MW)-scale racks coming soon to modern AI factories.  NVIDIA is leading the transition to 800 VDC data… Read More…