Application Spotlight: High-Voltage Electrical Distribution Panel Inspection

Oct 9, 2019

Without power, factory operations cannot continue. That’s why regular scheduled maintenance is important to ensure your electrical distribution system is in working order. A combination of a thermal imager and a clamp meter can help you detect hot spots and diagnose electrical issues at the point of failure before an outage occurs, quickly and safely.  Download the Application Spotlight today.

Electrical Industry News Week

https://www.flir.ca/instruments/utilities/application-spotlight-high-voltage-electrical-distributionpanel-inspection/?utm_source=electrical-industry-news-week&utm_medium=email-newsletter&utm_term=&utm_content=utility-app-spotlight-distribution-panel&utm_campaign=25.05.A.RW.CA.utility-app-spotlight-distribution-panel(Email-Newsletter)

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles